close
close

Ero Copper Hits Record Q4 Production Despite Net Loss, Projects Strong 2025 Growth



Ero Copper (TSX: ERO, NYSE: ERO) has reported its Q4 and full-year 2024 financial results, achieving record quarterly copper production of 12,883 tonnes and full-year production of 40,600 tonnes in concentrate. Key financial metrics include Q4 cash flow from operations of $60.8M and full-year of $145.4M, with Q4 adjusted EBITDA of $59.1M and full-year of $216.2M.

The company reported a net loss of $48.9M ($0.47 per diluted share) for Q4 and $68.5M ($0.66 per diluted share) for the full year. Copper C1 cash costs at Caraíba Operations were $1.85/lb for Q4 and $1.97/lb for the year. Gold production reached 8,936 ounces in Q4 and 57,210 ounces for the full year.

The company enhanced its financial flexibility by amending its Credit Facility, increasing commitments from $150M to $200M and extending maturity to December 2028. Year-end available liquidity stood at $90.4M. For 2025, Ero Copper projects consolidated copper production of 75,000-85,000 tonnes, with the Tucumã Operation expected to drive significant growth.

Ero Copper (TSX: ERO, NYSE: ERO) ha riportato i risultati finanziari del Q4 e dell’intero anno 2024, raggiungendo una produzione record di rame di 12.883 tonnellate nel trimestre e una produzione annuale di 40.600 tonnellate in concentrato. Le principali metriche finanziarie includono un flusso di cassa dalle operazioni di $60,8 milioni nel Q4 e un totale annuale di $145,4 milioni, con un EBITDA rettificato di $59,1 milioni per il Q4 e di $216,2 milioni per l’intero anno.

L’azienda ha riportato una perdita netta di $48,9 milioni ($0,47 per azione diluita) per il Q4 e di $68,5 milioni ($0,66 per azione diluita) per l’anno intero. I costi di cassa C1 del rame presso le operazioni di Caraíba sono stati di $1,85/lb per il Q4 e di $1,97/lb per l’anno. La produzione d’oro ha raggiunto 8.936 once nel Q4 e 57.210 once per l’intero anno.

L’azienda ha migliorato la propria flessibilità finanziaria modificando la propria linea di credito, aumentando gli impegni da $150 milioni a $200 milioni e prolungando la scadenza a dicembre 2028. Alla fine dell’anno, la liquidità disponibile era di $90,4 milioni. Per il 2025, Ero Copper prevede una produzione consolidata di rame tra 75.000 e 85.000 tonnellate, con l’operazione Tucumã che si prevede guiderà una crescita significativa.

Ero Copper (TSX: ERO, NYSE: ERO) ha informado sus resultados financieros del Q4 y del año completo 2024, logrando una producción trimestral récord de cobre de 12,883 toneladas y una producción anual de 40,600 toneladas en concentrado. Las métricas financieras clave incluyen un flujo de caja de operaciones de $60.8 millones en el Q4 y un total anual de $145.4 millones, con un EBITDA ajustado de $59.1 millones para el Q4 y de $216.2 millones para el año completo.

La compañía reportó una pérdida neta de $48.9 millones ($0.47 por acción diluida) para el Q4 y de $68.5 millones ($0.66 por acción diluida) para el año completo. Los costos de efectivo C1 de cobre en las operaciones de Caraíba fueron de $1.85/lb para el Q4 y de $1.97/lb para el año. La producción de oro alcanzó 8,936 onzas en el Q4 y 57,210 onzas para el año completo.

La compañía mejoró su flexibilidad financiera al modificar su línea de crédito, aumentando los compromisos de $150 millones a $200 millones y extendiendo el vencimiento a diciembre de 2028. Al final del año, la liquidez disponible era de $90.4 millones. Para 2025, Ero Copper proyecta una producción consolidada de cobre de 75,000 a 85,000 toneladas, con la operación Tucumã que se espera impulse un crecimiento significativo.

Ero Copper (TSX: ERO, NYSE: ERO)는 2024년 4분기 및 연간 재무 결과를 발표하며 분기별 구리 생산량이 12,883톤, 연간 생산량이 40,600톤으로 기록을 세웠습니다. 주요 재무 지표로는 4분기 운영으로 인한 현금 흐름이 6,080만 달러, 연간 1억 4,540만 달러이며, 4분기 조정 EBITDA는 5,910만 달러, 연간 2억 1,620만 달러입니다.

회사는 4분기에 4,890만 달러($0.47의 희석 주당 손실) 및 연간 6,850만 달러($0.66의 희석 주당 손실)를 기록했습니다. Caraíba 운영에서의 구리 C1 현금 비용은 4분기에 파운드당 $1.85, 연간 $1.97이었습니다. 금 생산량은 4분기에 8,936온스, 연간 57,210온스에 달했습니다.

회사는 신용 시설을 수정하여 재무 유연성을 향상시켰으며, 약정 금액을 1억 5천만 달러에서 2억 달러로 늘리고 만기를 2028년 12월로 연장했습니다. 연말 가용 유동성은 9,040만 달러였습니다. 2025년을 위해 Ero Copper는 75,000-85,000톤의 통합 구리 생산을 계획하고 있으며, Tucumã 운영이 상당한 성장을 이끌 것으로 예상됩니다.

Ero Copper (TSX: ERO, NYSE: ERO) a publié ses résultats financiers pour le 4ème trimestre et l’année complète 2024, atteignant une production trimestrielle record de 12 883 tonnes de cuivre et une production annuelle de 40 600 tonnes en concentré. Les indicateurs financiers clés comprennent un flux de trésorerie d’exploitation de 60,8 millions de dollars pour le 4ème trimestre et de 145,4 millions de dollars pour l’année complète, avec un EBITDA ajusté de 59,1 millions de dollars pour le 4ème trimestre et de 216,2 millions de dollars pour l’année entière.

La société a enregistré une perte nette de 48,9 millions de dollars (0,47 $ par action diluée) pour le 4ème trimestre et de 68,5 millions de dollars (0,66 $ par action diluée) pour l’année complète. Les coûts de production C1 du cuivre aux opérations de Caraíba étaient de 1,85 $/lb pour le 4ème trimestre et de 1,97 $/lb pour l’année. La production d’or a atteint 8 936 onces au 4ème trimestre et 57 210 onces pour l’année entière.

La société a amélioré sa flexibilité financière en modifiant sa ligne de crédit, augmentant les engagements de 150 millions de dollars à 200 millions de dollars et en prolongeant l’échéance jusqu’en décembre 2028. À la fin de l’année, la liquidité disponible s’élevait à 90,4 millions de dollars. Pour 2025, Ero Copper prévoit une production consolidée de cuivre de 75 000 à 85 000 tonnes, l’exploitation de Tucumã devant entraîner une croissance significative.

Ero Copper (TSX: ERO, NYSE: ERO) hat seine finanziellen Ergebnisse für das 4. Quartal und das gesamte Jahr 2024 veröffentlicht und eine Rekordproduktion von 12.883 Tonnen Kupfer im Quartal sowie eine Jahresproduktion von 40.600 Tonnen im Konzentrate erzielt. Wichtige Finanzkennzahlen umfassen einen Cashflow aus dem operativen Geschäft von 60,8 Millionen USD im 4. Quartal und insgesamt 145,4 Millionen USD im Jahr, mit einem bereinigten EBITDA von 59,1 Millionen USD für das 4. Quartal und 216,2 Millionen USD für das gesamte Jahr.

Das Unternehmen berichtete über einen Nettoverlust von 48,9 Millionen USD (0,47 USD pro verwässerter Aktie) für das 4. Quartal und 68,5 Millionen USD (0,66 USD pro verwässerter Aktie) für das gesamte Jahr. Die C1-Bargeldkosten für Kupfer in den Caraíba-Betrieben lagen im 4. Quartal bei 1,85 USD/lb und im Jahr bei 1,97 USD/lb. Die Goldproduktion erreichte 8.936 Unzen im 4. Quartal und 57.210 Unzen für das gesamte Jahr.

Das Unternehmen hat seine finanzielle Flexibilität erhöht, indem es seine Kreditfazilität geändert hat, die Verpflichtungen von 150 Millionen USD auf 200 Millionen USD erhöht und die Fälligkeit auf Dezember 2028 verlängert hat. Am Jahresende betrug die verfügbare Liquidität 90,4 Millionen USD. Für 2025 plant Ero Copper eine konsolidierte Kupferproduktion von 75.000 bis 85.000 Tonnen, wobei der Betrieb Tucumã voraussichtlich ein erhebliches Wachstum antreiben wird.

Positive

  • Record Q4 copper production of 12,883 tonnes
  • Strong Q4 cash flow from operations of $60.8M
  • Credit Facility increased from $150M to $200M
  • Tucumã Operation set for significant production growth in 2025
  • Available liquidity of $90.4M at year-end

Negative

  • Q4 net loss of $48.9M ($0.47 per share)
  • Full-year net loss of $68.5M ($0.66 per share)
  • Increased gold AISC to $1,691/oz in Q4
  • Lower gold production and grades compared to 2023

Insights

Ero Copper delivered record copper production in Q4 with 12,883 tonnes, bringing full-year output to 40,600 tonnes. However, financial results show a mixed picture. Despite positive operating cash flow of $60.8 million for Q4 and $145.4 million for the year, the company reported a net loss of $48.9 million for Q4 and $68.5 million for 2024.

The substantial gap between operating results and bottom-line performance reflects the capital-intensive ramp-up phase at the Tucumã Operation, which contributed 4,317 tonnes of copper in Q4 but hasn’t yet reached commercial production. Notably, the company reported adjusted EBITDA of $59.1 million in Q4 and $216.2 million for the year, with adjusted net income of $17.4 million in Q4 and $80.4 million for the year – indicating underlying profitability when excluding non-recurring items.

Cost control appears reasonably effective with copper C1 cash costs at $1.85 per pound in Q4 at Caraíba, benefiting from improved concentrate treatment terms and favorable BRL exchange rates. The Xavantina gold operations saw increased costs with C1 cash costs rising to $744 per ounce and AISC jumping to $1,691 per ounce in Q4, largely due to lower production volumes.

The company has enhanced its financial flexibility by expanding its credit facility from $150 million to $200 million and extending maturity to 2028, providing additional liquidity to support the Tucumã ramp-up. With year-end available liquidity of $90.4 million and the expanded credit facility, Ero appears adequately funded to complete its growth initiatives.

2025 guidance projects substantial growth with consolidated copper production expected to reach 75,000-85,000 tonnes – representing an 85%-110% increase from 2024 levels – as Tucumã achieves commercial production. This positions 2025 as a potentially transformative year for the company’s production profile and cash generation capacity.

Ero Copper’s operational performance reveals several key developments across its mining portfolio. At Caraíba, the engagement of an additional development contractor signals proactive management of underground flexibility challenges, addressing a critical operational bottleneck. This investment in accelerated development should improve mining sequence optionality by Q2-Q3 2025.

The Tucumã Operation’s ramp-up continues with encouraging metallurgical indicators – 89.1% recovery rates align with design specifications, validating the processing flowsheet. However, the scheduled downtime in Q1 2025 for the tailings filtration circuit indicates typical commissioning challenges requiring resolution before full-scale production. The proactive approach to addressing these bottlenecks during ramp-up is operationally sound rather than forcing throughput at the expense of system stability.

Mining operations at Tucumã running ahead of schedule has created valuable ore stockpiles, providing operational flexibility during the commissioning phase. This buffer will help maintain consistent mill feed during the transition to commercial production expected in H1 2025.

At Xavantina, the gold operation faces grade challenges with both quarterly and annual production decreases reflecting lower processed gold grades. The projected 2025 gold C1 cash cost range of $650-$800 per ounce suggests continuing grade variability, though the guidance indicates expectations of returning to long-term block model averages, which should stabilize performance.

The 2025 capital expenditure reduction to $230-$270 million represents the transition from construction to production at Tucumã. This shift from capital deployment to cash generation is the inflection point investors have been anticipating. The sequential quarterly production increase forecast for 2025 indicates confidence in the ramp-up trajectory, with total copper production projected to nearly double year-over-year as Tucumã achieves design capacity.







(all amounts in US dollars, unless otherwise noted)

VANCOUVER, British Columbia, March 06, 2025 (GLOBE NEWSWIRE) — Ero Copper Corp. (TSX: ERO, NYSE: ERO) (“Ero” or the “Company”) is pleased to announce its operating and financial results for the three and twelve months ended December 31, 2024. Management will host a conference call tomorrow, Friday, March 7, 2025, at 11:30 a.m. eastern time to discuss the results. Dial-in details for the call can be found near the end of this press release.

HIGHLIGHTS

  • Consolidated fourth quarter copper production was a record 12,883 tonnes, bringing full-year copper production to 40,600 tonnes in concentrate.
  • Copper C1 cash costs(*) for the quarter and year at the Caraíba Operations were $1.85 and $1.97, respectively, per pound of copper produced.
  • Fourth quarter and full-year gold production were 8,936 ounces and 57,210 ounces, respectively.
  • Gold C1 cash costs(*) for the quarter and year were $744 and $493, respectively, per ounce of gold produced. All-in Sustaining Costs (“AISC”)(*) for the same periods were $1,691 and $1,006, respectively, per ounce.
  • Strong financial results were driven by record copper production during the fourth quarter and improved metal prices and operating margins for the full year.
    • Cash flow from operations for the quarter and year were $60.8 million and $145.4 million, respectively.
    • Fourth quarter and full-year adjusted EBITDA(*) were $59.1 million and $216.2 million, respectively.
    • Net loss attributable to the owners of the Company was $48.9 million ($0.47 per share on a diluted basis) for the quarter and $68.5 million ($0.66 per share on a diluted basis) for the year.
    • Adjusted net income attributable to the owners of the Company(*) for the quarter and year were $17.4 million ($0.17 per share on a diluted basis) and $80.4 million ($0.78 per share on a diluted basis), respectively.

(*) These are non-IFRS measures and do not have a standardized meaning prescribed by IFRS and might not be comparable to similar financial measures disclosed by other issuers. Please refer to the Company’s discussion of Non-IFRS measures in its Management’s Discussion and Analysis for the year ended December 31, 2024 and the Reconciliation of Non-IFRS Measures section at the end of this press release.

  • Available liquidity at year-end was $90.4 million, including $50.4 million in cash and cash equivalents, $15.0 million of undrawn availability under the Company’s senior secured revolving credit facility (“Credit Facility”), and $25.0 million of undrawn availability under the copper prepayment facility. In January 2025, the Company amended its Credit Facility to enhance financial flexibility and support its larger operational footprint. The amendment, which included an increase in aggregate commitments from $150 million to $200 million, added $50 million of liquidity subsequent to year-end. Other updates to the Credit Facility included:
    • An extension of the maturity date from December 2026 to December 2028.
    • Improved terms, including a 25-basis point reduction to the applicable margin on drawn funds at certain leverage ratios.
  • The Company is reaffirming its 2025 production, operating cost and capital expenditure guidance.

“The strategic investments we made to grow our business in 2023 and 2024 have positioned us for a pivotal year ahead, with the Tucumã Operation set to drive transformational growth in both copper production and cash flow from operations,” said Makko DeFilippo, President and Chief Executive Officer. “With important work completed during an extended maintenance shutdown at Tucumã over the past several weeks, we are seeing consistency in plant throughput and copper production and expect to see improved operational performance going forward, as reflected in our 2025 guidance.

“We anticipate a record year by every measure for 2025 as we work diligently to complete the ramp-up to commercial production at Tucumã and restore operational flexibility at Caraíba. With a strong foundation in place, our focus is on delivering safe production, driving innovation to improve margins, and creating long-term value for our stakeholders through the advancement of Furnas over the months ahead.”

FOURTH QUARTER AND FULL YEAR 2024 REVIEW

The Caraíba Operations

  • Quarterly copper production totaled 8,566 tonnes, bringing full-year copper production to 35,444 tonnes in concentrate.
  • C1 cash costs(*) and operating margins continued to benefit from improved concentrate treatment and refining charges secured in May 2024, as well as a more favorable USD to BRL exchange rate. As a result, the Caraíba Operations reported C1 cash costs(*) of $1.85 per pound of copper produced for the quarter and $1.97 per pound for the full year.
  • During the quarter, the Company engaged an additional development contractor to support accelerated development rates and improved operational flexibility. Mobilization of the additional contractor is expected to be complete by the end of Q1 2025.

The Tucumã Operation

  • Ramp-up of the processing operations continued to deliver important progress during the quarter as metallurgical recoveries and concentrate grades remained in line with design targets, while throughput volumes steadily increased month-over-month.
  • Production for the quarter was 4,317 tonnes of copper in concentrate, with plant throughput totaling 223,013 tonnes and metallurgical recovery rates averaging 89.1%. Full-year production totaled 5,156 tonnes in concentrate.
  • Mining operations continued to progress ahead of schedule, contributing to run-of- mine stockpiles available for processing in 2025.
  • Scheduled mill downtime during the first quarter to improve consistency of operations and address bottlenecks within the tailings filtration circuit is well underway and expected to be completed by the end of March 2025. This downtime has been reflected in the Company’s full-year guidance.

The Xavantina Operations

  • Quarterly gold production totaled 8,936 ounces, reflecting lower mined and processed tonnage and grades compared to the prior quarter. Consequently, C1 cash costs(*) and AISC(*) increased quarter-on-quarter to $744 and $1,691, respectively, per ounce of gold produced.
  • Full-year gold production of 57,210 ounces declined compared to 2023, primarily due to lower planned mined and processed gold grades. As a result, C1 cash costs(*) and AISC(*) increased year-on-year to $493 and $1,006 respectively, per ounce.

(*) These are non-IFRS measures and do not have a standardized meaning prescribed by IFRS and might not be comparable to similar financial measures disclosed by other issuers. Please refer to the Company’s discussion of Non-IFRS measures in its Management’s Discussion and Analysis for the year ended December 31, 2024 and the Reconciliation of Non-IFRS Measures section at the end of this press release.

OPERATING HIGHLIGHTS 2024 – Q4 2024 – Q3 2023 – Q4   2024   2023
Copper (Caraíba Operations)          
Ore Mined (tonnes)   713,980   874,937   886,271   3,274,410   3,341,121
Ore Processed (tonnes)   719,942   900,289   812,202   3,431,294   3,231,667
Grade (% Cu)   1.30   1.20   1.59   1.14   1.49
Recovery (%)   91.8   91.9   91.0   90.6   91.4
Cu Production (tonnes)   8,566   9,920   11,760   35,444   43,857
Cu Production (000 lbs)   18,883   21,871   25,926   78,140   96,688
Cu Sold in Concentrate (tonnes)   8,420   9,970   11,429   36,557   42,595
Cu Sold in Concentrate (000 lbs)   18,563   21,980   25,197   80,594   93,906
Cu C1 cash cost(1)(2) $         1.85 $ 1.63 $ 1.75 $         1.97 $ 1.80
Copper (Tucumã Operation)          
Ore Mined (tonnes)   1,065,108   867,315     1,932,423  
Ore Processed (tonnes)   223,013   110,778     333,791  
Grade (% Cu)   2.17   1.00     1.78  
Recovery (%)   89.1   75.7     86.6  
Cu Production (tonnes)   4,317   839     5,156  
Cu Production (000 lbs)   9,516   1,850     11,366  
Cu Sold in Concentrate (tonnes)   3,750   357     4,107  
Cu Sold in Concentrate (000 lbs)   8,268   787     9,055  
Gold (Xavantina Operations)          
Ore Mined (tonnes)   26,119   41,761   34,417   146,160   135,982
Ore Processed (tonnes)   26,120   41,761   34,416   146,161   136,002
Grade (g / tonne)   11.18   11.41   17.18   13.37   15.13
Recovery (%)   92.8   92.5   88.7   92.0   89.5
Au Production (oz)   8,936   13,485   16,867   57,210   59,222
Au Sold (oz)   11,106   14,615   18,479   60,195   57,949
Au C1 cash cost(1) $         744 $ 539 $ 413 $         493 $ 422
Au AISC(1) $         1,691 $ 1,034 $ 991 $         1,006 $ 957

(1) EBITDA, adjusted EBITDA, adjusted net income (loss) attributable to owners of the Company, adjusted net income (loss) per share attributable to owners of the Company, net (cash) debt, working capital, copper C1 cash cost, copper C1 cash cost including foreign exchange hedges, gold C1 cash cost and gold AISC are non-IFRS measures. These measures do not have a standardized meaning prescribed by IFRS and might not be comparable to similar financial measures disclosed by other issuers. Please refer to the Company’s discussion of Non-IFRS measures in its Management’s Discussion and Analysis for the year ended December 31, 2024 and the Reconciliation of Non-IFRS Measures section at the end of this press release.
(2) Copper C1 cash cost including foreign exchange hedges was $2.07 in Q4 2024 (Q4 2023 – $1.59) and $2.05 in Fiscal 2024 (Fiscal 2024 – $1.68).

FINANCIAL HIGHLIGHTS
($ in millions, except per share amounts)

  2024 – Q4
  2024 – Q3
  2023 – Q4   2024     2023
Revenues $         122.5   $ 124.8   $ 116.4 $         470.3   $ 427.5
Gross profit   52.4     53.7     41.9   180.6     156.8
EBITDA(1)   (31.4 )   74.5     73.7   24.8     208.7
Adjusted EBITDA(1)   59.1     62.2     50.3   216.2     183.5
Cash flow from operations   60.8     52.7     49.4   145.4     163.1
Net (loss) income   (48.9 )   41.4     37.1   (67.8 )   94.3
Net (loss) income attributable to owners of the   (48.9 )   40.9     36.5   (68.5 )   92.8
Per share (basic)   (0.47 )   0.40     0.37   (0.66 )   0.99
Per share (diluted)   (0.47 )   0.39     0.37   (0.66 )   0.98
Adjusted net income attributable to owners of the Company(1)   17.4     27.6     20.7   80.4     82.8
Per share (basic)   0.17     0.27     0.21   0.78     0.88
Per share (diluted)   0.17     0.27     0.21   0.78     0.87
Cash, cash equivalents, and short-term   50.4     20.2     111.7   50.4     111.7
Working (deficit) capital(1)   (69.9 )   (60.9 )   25.7   (69.9 )   25.7
Net debt(1)   551.8     518.7     314.5   551.8     314.5

(1) EBITDA, adjusted EBITDA, adjusted net income (loss) attributable to owners of the Company, adjusted net income (loss) per share attributable to owners of the Company, net (cash) debt, working capital, copper C1 cash cost, copper C1 cash cost including foreign exchange hedges, gold C1 cash cost and gold AISC are non-IFRS measures. These measures do not have a standardized meaning prescribed by IFRS and might not be comparable to similar financial measures disclosed by other issuers. Please refer to the Company’s discussion of Non-IFRS measures in its Management’s Discussion and Analysis for the year ended December 31, 2024 and the Reconciliation of Non-IFRS Measures section at the end of this press release.

2025 PRODUCTION AND COST GUIDANCE(*)

Consolidated copper production for 2025 is expected to range between 75,000 to 85,000 tonnes. The Company remains focused on steadily increasing plant throughput and achieving commercial production at the Tucumã Operation in H1 2025. As a result, copper production is expected to increase sequentially each quarter, with Tucumã expected to contribute significantly to the full-year consolidated copper production.

At the Xavantina Operations, annual gold production is expected to remain steady at 50,000 to 60,000, with mill throughput volumes projected to increase and mined and processed gold grades expected to return to long-term block model averages.

Copper C1 cash cost guidance on a consolidated basis is $1.55 to $1.80 per pound of copper produced. This is based on C1 cash cost guidance ranges of $2.15 to $2.35 per pound for the Caraíba Operations and $1.05 to $1.25 per pound at the Tucumã Operation.

At the Xavantina Operations, the C1 cash cost guidance range of $650 to $800 per ounce of gold produced reflects a planned decrease in mined and processed gold grades. The AISC guidance range for 2025 is $1,400 to $1,600 per ounce of gold produced.

Consolidated Copper Production (tonnes)  
Caraíba Operations 37,500 – 42,500
Tucumã Operation 37,500 – 42,500
Total Copper 75,000 – 85,000
Consolidated Copper C1 Cash Cost(1) Guidance  
Caraíba Operations $2.15$2.35
Tucumã Operation $1.05$1.25
Consolidated Copper Operations $1.55$1.80
The Xavantina Operations  
Au Production (ounces) 50,000 – 60,000
Gold C1 Cash Cost(1) Guidance $650$800
Gold AISC(1) Guidance $1,400$1,600

Note: Guidance is based on estimates and assumptions including, but not limited to, mineral reserve estimates, grade and continuity of interpreted geological formations and metallurgical recovery performance. Please refer to the Company’s SEDAR+ and EDGAR filings, including the most recent Annual Information Form (“AIF”), for a detailed summary of risk factors.
(1) Please refer to the section titled “Alternative Performance (Non-IFRS) Measures” within the MD&A.

2025 CAPITAL EXPENDITURE GUIDANCE(*)

Capital expenditures are expected to decrease to a range of $230 to $270 million, primarily due to significantly lower capital expenditures at the Tucumã Operation following the completion of construction in 2024.

Figures presented in the table below are in USD millions.

Caraíba Operations $165$180
Tucumã Operation(1) $30$40
Xavantina Operations $25$35
Furnas Copper-Gold Project and Other Exploration $10$15
Total $230$270

Note: Guidance is based on certain estimates and assumptions, including but not limited to, mineral reserve estimates, grade and continuity of interpreted geological formations and metallurgical performance. Please refer to the Company’s most recent Annual Information Form and Management of Risks and Uncertainties in the MD&A for complete risk factors.
(1) Excludes capitalized ramp-up costs prior to the declaration of commercial.

CONFERENCE CALL DETAILS

The Company will hold a conference call on Friday, March 7, 2025 at 11:30 am Eastern time (8:30 am Pacific time) to discuss these results. A results presentation will be available for download via the webcast link and in the Presentations section of the Company’s website on the day of the conference call.

Date:         Friday, March 7, 2025
Time:   11:30 am Eastern time (8:30 am Pacific time)
Dial in:   Canada/USA Toll Free: 1-844-763-8274
International: +1-647-484-8814

Please dial in 5-10 minutes prior to the start of the call or pre-register using this link to bypass the live operator queue.

(https://dpregister.com/sreg/10196217/fe5a12f75d)

 Webcast:   To access the webcast, click here.

(https://event.choruscall.com/mediaframe/webcast.html?webcastid=mvwyHhWr)

Replay:   Canada/USA: 1-855-669-9658, International: +1-412-317-0088
For country-specific dial-in numbers, click here.

(https://services.choruscall.com/ccforms/replay.html)

Replay Passcode:   2945658
     

Reconciliation of Non-IFRS Measures

Financial results of the Company are presented in accordance with IFRS. The Company utilizes certain alternative performance (non-IFRS) measures to monitor its performance, including copper C1 cash cost, copper C1 cash cost including foreign exchange hedges, gold C1 cash cost, gold AISC, EBITDA, adjusted EBITDA, adjusted net income attributable to owners of the Company, adjusted net income per share, net (cash) debt, working capital and available liquidity. These performance measures have no standardized meaning prescribed within generally accepted accounting principles under IFRS and, therefore, amounts presented may not be comparable to similar measures presented by other mining companies. These non-IFRS measures are intended to provide supplemental information and should not be considered in isolation or as a substitute for measures of performance prepared in accordance with IFRS.

For additional details please refer to the Company’s discussion of non-IFRS and other performance measures in its Management’s Discussion and Analysis for the year ended December 31, 2024 which is available on SEDAR+ at www.sedarplus.ca, and on EDGAR at www.sec.gov.

Copper C1 cash cost and copper C1 cash cost including foreign exchange hedges

The following table provides a reconciliation of copper C1 cash cost to cost of production, its most directly comparable IFRS measure.

Reconciliation:     2024 – Q4       2024 – Q3       2023 – Q4       2024       2023  
Cost of production   $         33,685     $ 40,149     $ 39,790     $         158,006     $ 153,187  
Add (less):                    
Transportation costs & other     1,149       1,283       1,853       4,967       6,539  
Treatment, refining, and other     2,934       3,170       7,332       15,332       28,323  
By-product credits     (5,163 )     (6,584 )     (3,394 )     (17,618 )     (12,930 )
Incentive payments     1,127       (1,138 )     (1,693 )     (2,384 )     (5,668 )
Net change in inventory     927       (1,220 )     1,434       (4,654 )     4,407  
Foreign exchange translation and other     168       3       20       185       (149 )
C1 cash costs(1)     34,827       35,663       45,342       153,834       173,709  
(Gain) loss on foreign exchange hedges     4,166       1,965       (4,185 )     5,901       (11,417 )
C1 cash costs including foreign exchange hedges   $ 38,993     $ 37,628     $ 41,157     $ 159,735     $ 162,292  
Mining   $         24,906     $ 26,529     $ 26,646     $         104,572     $ 102,908  
Processing     6,580       7,069       8,177       28,753       30,736  
Indirect     5,570       5,479       6,581       22,795       24,672  
Production costs     37,056       39,077       41,404       156,120       158,316  
By-product credits     (5,163 )     (6,584 )     (3,394 )     (17,618 )     (12,930 )
Treatment, refining and other     2,934       3,170       7,332       15,332       28,323  
C1 cash costs(1)     34,827       35,663       45,342       153,834       173,709  
(Gain) loss on foreign exchange hedges     4,166       1,965       (4,185 )     5,901       (11,417 )
C1 cash costs including foreign exchange   $         38,993     $ 37,628     $ 41,157     $         159,735     $ 162,292  
                                         

(1) Copper C1 cash costs for 2024 do not include Tucumã Operation’s results, as commercial production has not been achieved as of December 31, 2024.

    2024 – Q4   2024 – Q3   2023 – Q4     2024       2023  
Costs per pound                    
Total copper produced (lbs, 000)     18,883       21,871       25,926       78,140       96,688  
                                         
Mining   $         1.32     $ 1.22     $ 1.03     $         1.34     $ 1.06  
Processing   $         0.35     $ 0.32     $ 0.32     $         0.37     $ 0.32  
Indirect   $         0.29     $ 0.25     $ 0.25     $         0.29     $ 0.26  
By-product credits   $         (0.27 )   $ (0.30 )   $ (0.13 )   $         (0.23 )   $ (0.13 )
Treatment, refining and other   $         0.16     $ 0.14     $ 0.28     $         0.20     $ 0.29  
Copper C1 cash costs(1)   $         1.85     $ 1.63     $ 1.75     $         1.97     $ 1.80  
(Gain) loss on foreign exchange hedges   $         0.22     $ 0.09     $ (0.16 )   $         0.08     $ (0.12 )
Copper C1 cash costs including foreign exchange hedges    $ 2.07     $ 1.72     $ 1.59     $ 2.05     $ 1.68  

(1) Copper C1 cash costs for 2024 do not include Tucumã Operation’s results, as commercial production has not been achieved as of December 31, 2024.

Gold C1 cash cost and gold AISC

The following table provides a reconciliation of gold C1 cash cost and gold AISC to cost of production, its most directly comparable IFRS measure.

Reconciliation:   2024 – Q4   2024 – Q3   2023 – Q4   2024       2023  
Cost of production   $         9,000     $ 6,220     $ 7,122   $         30,055     $ 25,209  
Add (less):                  
Incentive payments     (434 )     (378 )     (386 )   (1,481 )     (1,424 )
Net change in inventory     (1,914 )     1,378       65     (594 )     862  
By-product credits     (189 )     (232 )     (248 )   (869 )     (827 )
Smelting and refining     62       79       113     328       353  
Foreign exchange translation and other     125       203       296     775       806  
C1 cash costs   $         6,650     $ 7,270     $ 6,962   $         28,214     $ 24,979  
Site general and administrative     1,576       1,321       1,492     5,600       5,366  
Accretion of mine closure and rehabilitation     78       82       111     340       439  
Sustaining capital expenditure     4,597       2,784       5,499     13,288       16,300  
Sustaining lease payments     1,681       1,801       1,861     7,512       7,093  
Royalties and production taxes     526       686       785     2,584       2,487  
AISC   $ 15,108     $ 13,944     $ 16,710   $ 57,538     $ 56,664  
                                       
  2024 – Q4 2024 – Q3 2023 – Q4   2024     2023  
Costs                              
Mining $         3,325   $ 3,852   $ 3,430   $         14,702   $ 12,154  
Processing   2,162     2,419     2,315     9,117     8,433  
Indirect   1,290     1,152     1,352     4,936     4,866  
Production costs   6,777     7,423     7,097     28,755     25,453  
Smelting and refining costs   62     79     113     328     353  
By-product credits   (189 )   (232 )   (248 )   (869 )   (827 )
C1 cash costs $         6,650   $ 7,270   $ 6,962   $         28,214   $ 24,979  
Site general and administrative   1,576     1,321     1,492     5,600     5,366  
Accretion of mine closure and rehabilitation   78     82     111     340     439  
Sustaining capital expenditure   4,597     2,784     5,499     13,288     16,300  
Sustaining leases   1,681     1,801     1,861     7,512     7,093  
Royalties and production taxes   526     686     785     2,584     2,487  
AISC $         15,108   $ 13,944   $ 16,710   $         57,538   $ 56,664  
Costs per ounce          
Total gold produced (ounces)   8,936     13,485     16,867     57,210     59,222  
Mining $         372   $ 286   $ 203   $         257   $ 205  
Processing $         242   $ 179   $ 137   $         159   $ 142  
Indirect $         144   $ 85   $ 80   $         86   $ 82  
Smelting and refining $         7   $ 6   $ 7   $         6   $ 6  
By-product credits $         (21 ) $ (17 ) $ (14 ) $         (15 ) $ (13 )
Gold C1 cash cost $         744   $ 539   $ 413   $         493   $ 422  
Gold AISC $         1,691   $ 1,034   $ 991   $         1,006   $ 957  
                               

Earnings before interest, taxes, depreciation and amortization (EBITDA) and Adjusted EBITDA

The following table provides a reconciliation of EBITDA and Adjusted EBITDA to net income, its most directly comparable IFRS measure.

Reconciliation:   2024 – Q4   2024 – Q3   2023 – Q4   2024       2023  
Net (Loss) Income   $         (48,928 )   $ 41,367     $ 37,052   $         (67,790 )   $ 94,304  
Adjustments:                  
Finance expense     3,851       4,039       5,284     17,089       25,822  
Finance income     (690 )     (781 )     (1,989 )   (4,300 )     (12,465 )
Income tax (recovery) expense     (5,862 )     8,331       8,415     (7,651 )     18,047  
Amortization and depreciation     20,265       21,555       24,980     87,410       83,024  
EBITDA   $         (31,364 )   $ 74,511     $ 73,742   $         24,758     $ 208,732  
Foreign exchange loss (gain)     92,804       (17,246 )     (24,871 )   165,008       (34,612 )
Share based compensation     (7,496 )     4,859       477     9,983       9,218  
Change in rehabilitation and closure provision(1)     4,609                 4,609        
Write-down of exploration and evaluation asset     839       467           12,051        
Unrealized (gain) loss on commodity derivatives     (250 )     (360 )     955     (238 )          115  
Adjusted EBITDA   $ 59,142     $ 62,231     $ 50,303   $ 216,171     $ 183,453  
                                       

(1) Change in rehabilitation and closure provision relates to revisions to rehabilitation and closure plans and cost estimates at the Company’s historic mining operations that have entered the closure phase, and for which there are no substantive future economic value. Such costs are reflected within other expenses on the Company’s Consolidated Statements of Operations and Comprehensive (Loss) Income.

Adjusted net income attributable to owners of the Company and Adjusted net income per share attributable to owners of the Company

The following table provides a reconciliation of Adjusted net income attributable to owners of the Company and Adjusted EPS to net income attributable to the owners of the Company, its most directly comparable IFRS measure.

Reconciliation: 2024 – Q4 2024 – Q3 2023 – Q4   2024     2023  
Net (loss) income as reported attributable to the owners of the Company $         (48,944 ) $ 40,857   $ 36,549   $         (68,475 ) $ 92,804  
Adjustments:          
Share based compensation   (7,496 )   4,859     477     9,983     9,218  
Unrealized foreign exchange loss (gain) on USD denominated balances in MCSA   66,971     (11,860 )   (10,308 )   114,885     (15,296 )
Unrealized foreign exchange loss (gain) on foreign exchange derivative contracts   15,182     (9,807 )   (9,852 )   30,685     (7,552 )
Change in rehabilitation and closure provision(1)   4,591             4,591      
Write-down of exploration and evaluation asset   836     465         12,046      
Unrealized (gain) loss on commodity derivatives   (243 )   (367 )   951     (240 )   115  
Tax effect on the above adjustments   (13,459 )   3,431     2,932     (23,060 )   3,472  
Adjusted net income attributable to owners of the Company $         17,438   $ 27,578   $ 20,749   $         80,415   $ 82,761  
           
Weighted average number of common shares          
Basic   103,345,064     103,239,881     98,099,791     103,106,305     94,111,548  
Diluted   103,877,690     103,973,827     98,482,755     103,713,563     94,896,334  
           
Adjusted EPS          
Basic $         0.17   $ 0.27   $ 0.21   $         0.78   $ 0.88  
Diluted $         0.17   $ 0.27   $ 0.21   $         0.78   $ 0.87  
                               

(1) Change in rehabilitation and closure provision relates to revisions to rehabilitation and closure plans and cost estimates at the Company’s historic mining operations that have entered the closure phase, and for which there are no substantive future economic value. Such costs are reflected within other expenses on the Company’s Consolidated Statements of Operations and Comprehensive (Loss) Income.

Net Debt (Cash)

The following table provides a calculation of net debt (cash) based on amounts presented in the Company’s consolidated financial statements as at the periods presented.

  December 31,
2024
  September 30,
2024
  December 31,
2023
Current portion of loans and borrowings $         45,893     $ 39,383     $ 20,381  
Long-term portion of loans and borrowings   556,296       499,527       405,852  
Less:          
Cash and cash equivalents   (50,402 )     (20,229 )     (111,738 )
Short-term investments                
Net debt (cash) $ 551,787     $ 518,681     $ 314,495  
                       

Working Capital and Available Liquidity

The following table provides a calculation for these based on amounts presented in the Company’s consolidated financial statements as at the periods presented.

      December 31,
2024
      September 30,
2024
      December 31,
2023
 
Current assets   $ 141,790     $ 126,808     $ 199,487  
Less: Current liabilities     (211,706 )     (187,708 )     (173,800 )
Working (deficit) capital   $ (69,916 )   $ (60,900 )   $ 25,687  
                         
Cash and cash equivalents     50,402       20,229       111,738  
Short-term investments                  
Available undrawn revolving credit facilities     15,000       80,000       150,000  
Available undrawn prepayment facilities(2)   $ 25,000     $ 25,000     $  
Available liquidity   $ 90,402      $ 125,229     $ 261,738  
                     

(1) In January 2025, the Company amended its Senior Credit Facility to increase the limit from $150.0 million to $200.0 million and extended the maturity from December 2026 to December 2028.
(2) In May 2024, the Company entered into a $50.0 million non-priced copper prepayment facility arrangement. Through March 31, 2025, the Company has the option to increase the size of the facility from $50.0 million to $75.0 million.

ABOUT ERO COPPER CORP

Ero Copper is a high-margin, high-growth copper producer with operations in Brazil and corporate headquarters in Vancouver, B.C. The Company’s primary asset is a 99.6% interest in the Brazilian copper mining company, Mineração Caraíba S.A. (“MCSA”), 100% owner of the Company’s Caraíba Operations, which are located in the Curaçá Valley, Bahia State, Brazil, and the Tucumã Operation, an open pit copper mine located in Pará State, Brazil. The Company also owns 97.6% of NX Gold S.A. (“NX Gold”) which owns the Xavantina Operations, an operating gold and silver mine located in Mato Grosso State, Brazil. In July 2024, the Company signed a definitive earn-in agreement with Vale Base Metals for a 60% interest in the Furnas Copper-Gold Project, located in the Carajás Mineral Province in Pará State, Brazil. For more information on the earn-in agreement, please see the Company’s press releases dated October 30, 2023 and July 22, 2024. Additional information on the Company and its operations, including technical reports on the Caraíba Operations, Xavantina Operations, Tucumã Operation and the Furnas Copper-Gold Project, can be found on the Company’s website (www.erocopper.com), on SEDAR+ (www.sedarplus.ca/landingpage/) and on EDGAR (www.sec.gov). The Company’s shares are publicly traded on the Toronto Stock Exchange and the New York Stock Exchange under the symbol “ERO”.

FOR MORE INFORMATION, PLEASE CONTACT

Courtney Lynn, Executive Vice President, External Affairs and Strategy
(604) 335-7504
info@erocopper.com

CAUTION REGARDING FORWARD LOOKING INFORMATION AND STATEMENTS

This press release contains “forward-looking statements” within the meaning of the United States Private Securities Litigation Reform Act of 1995 and “forward-looking information” within the meaning of applicable Canadian securities legislation (collectively, “forward-looking statements”). Forward-looking statements include statements that use forward-looking terminology such as “may”, “could”, “would”, “will”, “should”, “intend”, “target”, “plan”, “expect”, “budget”, “estimate”, “forecast”, “schedule”, “anticipate”, “believe”, “continue”, “potential”, “view” or the negative or grammatical variation thereof or other variations thereof or comparable terminology. Forward-looking statements may include, but are not limited to, statements with respect to the Company’s expected production, operating costs and capital expenditures at the Caraíba Operations, the Tucumã Operation and the Xavantina Operations; estimated timing for certain milestones, including completion of scheduled maintenance activities at the Tucumã Operation by the end of March 2025 and ramp-up of production levels and achievement of commercial production at the Tucumã Operation in H1 2025; mobilization of an additional underground development contractor by the end of Q1 2025 and accelerate development rates at the Pilar Mine; expectations related to exploration activities at the Furnas Project; expectations related to foreign exchange rates as well as copper concentrate treatment and refining charges; and any other statement that may predict, forecast, indicate or imply future plans, intentions, levels of activity, results, performance or achievements.

Forward-looking statements are subject to a variety of known and unknown risks, uncertainties and other factors that could cause actual results, actions, events, conditions, performance or achievements to materially differ from those expressed or implied by the forward-looking statements, including, without limitation, risks discussed in this press release and in the Company’s Annual Information Form for the year ended December 31, 2023 (“AIF”) under the heading “Risk Factors”. The risks discussed in this press release and in the AIF are not exhaustive of the factors that may affect any of the Company’s forward-looking statements. Although the Company has attempted to identify important factors that could cause actual results, actions, events, conditions, performance or achievements to differ materially from those contained in forward-looking statements, there may be other factors that cause results, actions, events, conditions, performance or achievements to differ from those anticipated, estimated or intended.

Forward-looking statements are not a guarantee of future performance. There can be no assurance that forward-looking statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Forward-looking statements involve statements about the future and are inherently uncertain, and the Company’s actual results, achievements or other future events or conditions may differ materially from those reflected in the forward-looking statements due to a variety of risks, uncertainties and other factors, including, without limitation, those referred to herein and in the AIF under the heading “Risk Factors”.

The Company’s forward-looking statements are based on the assumptions, beliefs, expectations and opinions of management on the date the statements are made, many of which may be difficult to predict and beyond the Company’s control. In connection with the forward-looking statements contained in this press release and in the AIF, the Company has made certain assumptions about, among other things: favourable equity and debt capital markets; the ability to raise any necessary additional capital on reasonable terms to advance the production, development and exploration of the Company’s properties and assets; future prices of copper, gold and other metal prices; the timing and results of exploration and drilling programs; the accuracy of any mineral reserve and mineral resource estimates; the geology of the Caraíba Operations, the Xavantina Operations, the Tucumã Operation and the Furnas Copper-Gold Project being as described in the respective technical report for each property; production costs; the accuracy of budgeted exploration, development and construction costs and expenditures; the price of other commodities such as fuel; future currency exchange rates, interest rates and tariff rates; operating conditions being favourable such that the Company is able to operate in a safe, efficient and effective manner; work force continuing to remain healthy in the face of prevailing epidemics, pandemics or other health risks, political and regulatory stability; the receipt of governmental, regulatory and third party approvals, licenses and permits on favourable terms; obtaining required renewals for existing approvals, licenses and permits on favourable terms; requirements under applicable laws; sustained labour stability; stability in financial and capital goods markets; availability of equipment; positive relations with local groups and the Company’s ability to meet its obligations under its agreements with such groups; and satisfying the terms and conditions of the Company’s current loan arrangements. Although the Company believes that the assumptions inherent in forward- looking statements are reasonable as of the date of this press release, these assumptions are subject to significant business, social, economic, political, regulatory, competitive and other risks and uncertainties, contingencies and other factors that could cause actual actions, events, conditions, results, performance or achievements to be materially different from those projected in the forward-looking statements. The Company cautions that the foregoing list of assumptions is not exhaustive. Other events or circumstances could cause actual results to differ materially from those estimated or projected and expressed in, or implied by, the forward-looking statements contained in this press release. There can be no assurance that forward-looking statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward-looking statements.

Forward-looking statements contained herein are made as of the date of this press release and the Company disclaims any obligation to update or revise any forward-looking statement, whether as a result of new information, future events or results or otherwise, except as and to the extent required by applicable securities laws.

CAUTIONARY NOTES REGARDING MINERAL RESOURCE AND MINERAL RESERVE ESTIMATES

Unless otherwise indicated, all reserve and resource estimates included in this press release and the documents incorporated by reference herein have been prepared in accordance with National Instrument 43-101, Standards of Disclosure for Mineral Projects (“NI 43-101″) and the Canadian Institute of Mining, Metallurgy and Petroleum (the “CIM”) — CIM Definition Standards on Mineral Resources and Mineral Reserves, adopted by the CIM Council, as amended (the “CIM Standards”). NI 43-101 is a rule developed by the Canadian Securities Administrators that establishes standards for all public disclosure an issuer makes of scientific and technical information concerning mineral projects. Canadian standards, including NI 43-101, differ significantly from the requirements of the United States Securities and Exchange Commission (the “SEC”), and reserve and resource information included herein may not be comparable to similar information disclosed by U.S. companies. In particular, and without limiting the generality of the foregoing, this press release and the documents incorporated by reference herein use the terms “measured resources,” “indicated resources” and “inferred resources” as defined in accordance with NI 43-101 and the CIM Standards.

Further to recent amendments, mineral property disclosure requirements in the United States (the “U.S. Rules”) are governed by subpart 1300 of Regulation S-K of the U.S. Securities Act of 1933, as amended (the “U.S. Securities Act”) which differ from the CIM Standards. As a foreign private issuer that is eligible to file reports with the SEC pursuant to the multi-jurisdictional disclosure system (the “MJDS”), Ero is not required to provide disclosure on its mineral properties under the U.S. Rules and will continue to provide disclosure under NI 43-101 and the CIM Standards. If Ero ceases to be a foreign private issuer or loses its eligibility to file its annual report on Form 40-F pursuant to the MJDS, then Ero will be subject to the U.S. Rules, which differ from the requirements of NI 43-101 and the CIM Standards.

Pursuant to the new U.S. Rules, the SEC recognizes estimates of “measured mineral resources”, “indicated mineral resources” and “inferred mineral resources”. In addition, the definitions of “proven mineral reserves” and “probable mineral reserves” under the U.S. Rules are now “substantially similar” to the corresponding standards under NI 43-101. Mineralization described using these terms has a greater amount of uncertainty as to its existence and feasibility than mineralization that has been characterized as reserves. Accordingly, U.S. investors are cautioned not to assume that any measured mineral resources, indicated mineral resources, or inferred mineral resources that Ero reports are or will be economically or legally mineable. Further, “inferred mineral resources” have a greater amount of uncertainty as to their existence and as to whether they can be mined legally or economically. Under Canadian securities laws, estimates of “inferred mineral resources” may not form the basis of feasibility or pre-feasibility studies, except in rare cases. While the above terms under the U.S. Rules are “substantially similar” to the standards under NI 43-101 and CIM Standards, there are differences in the definitions under the U.S. Rules and CIM Standards. Accordingly, there is no assurance any mineral reserves or mineral resources that Ero may report as “proven mineral reserves”, “probable mineral reserves”, “measured mineral resources”, “indicated mineral resources” and “inferred mineral resources” under NI 43-101 would be the same had Ero prepared the reserve or resource estimates under the standards adopted under the U.S. Rules.









FAQ



What were Ero Copper’s (ERO) Q4 2024 production and financial highlights?


ERO achieved record Q4 copper production of 12,883 tonnes, with cash flow from operations of $60.8M and adjusted EBITDA of $59.1M. The company reported a Q4 net loss of $48.9M ($0.47 per diluted share).


What is Ero Copper’s (ERO) production guidance for 2025?


ERO expects consolidated copper production of 75,000-85,000 tonnes and gold production of 50,000-60,000 ounces for 2025.


How did Ero Copper (ERO) enhance its financial flexibility in 2025?


ERO amended its Credit Facility in January 2025, increasing commitments from $150M to $200M and extending maturity to December 2028, with improved terms including a 25-basis point reduction in margin.


What were Ero Copper’s (ERO) operating costs for copper and gold in Q4 2024?


ERO’s Q4 copper C1 cash costs at Caraíba were $1.85/lb, while gold C1 cash costs were $744/oz with AISC of $1,691/oz.